Polimeks Construction

Your choice for any project
in world standards Tekno Pool

OTHER PROJECTS



EXTRAS : Steam Room
LOCATION : Türkmenistan

PROJECT NAME : Polimeks PAIB Administrative Building Steam Room 
PROJECT LOCATION : Turkmenistan
PROJECT OWNER : Polimeks Construction
PROJECT SCOEP : Steam Room
PROJECT START DATE : 2012
COMPLETION DATE     : 2012
PROJECT DURATION : 
PROJECT DETAILS : 
 
 
Construction of female steam room measuring 1.5 x 2.5 m

• Luxury steam generation unit
• Stainless steel generation tank
• Interchangeable corrosion resistant resistance
• Water level controller
• Safety valve and automatic shut-off
• High temperature thermostat
• Automatic tank bluff
• External thermocouple
• Gradual operation
• Silent steam production
• Luxury digital control panel
• Settable between 50-110 ° C
• Digital temperature and time indication
• Precise temperature and time setting with touch digital keys
• 0-24 hours time and temperature programming
• Touch light control key
• Programming over 1, 3, 12 and 24 hours
• Energy saving feature with stand-by
• Digital clock
• Water treatment and softening group
• Eucalyptus steam bath smell


Construction of male steam room measuring 1.5 x 2.5 m

• Luxury steam generation unit
• Stainless steel generation tank
• Interchangeable corrosion resistant resistance
• Water level controller
• Safety valve and automatic shut-off
• High temperature thermostat
• Automatic tank bluff
• External thermocouple
• Gradual operation
• Silent steam production
• Luxury digital control panel
• Settable between 50-110 ° C
• Digital temperature and time indication
• Precise temperature and time setting with touch digital keys
• 0-24 hours time and temperature programming
• Touch light control key
• Programming over 1, 3, 12 and 24 hours
• Energy saving feature with stand-by
• Digital clock
• Water treatment and softening group
• Eucalyptus steam bath smell






Home / Projects /